Friday, February 16, 2018

Well here goes, need to ripe out the old stuff.


This is the old stuff and she is really looking forward seeing this all pulled out. 



Now the old vanity is pretty much built in. It is not a free standing one.  So we just needed to pull the front off and cut the bottom of it out. There were a couple of 1x1 holding up the top. Trying not to break the pipes. Which by God' Grace we didn't 



This is going along so well today. We started putting in the vinyl flooring.
We ran over to the land fill and dropped the garbage off and then went to Home Depot to pick up the toilet. She was nor sure until the next morning what one she wanted. 



The flooring took us about 2 1/2 hours. I was very happy to get this part done. Pulled the new vaniy in. To see what we need to cut out to get around the old pipes. 


This was the easiest vanity we have done. The reason was it was a well built one. This should have cost her $349.00 without the top part. (sink) The other vanity we have put it in had the top on them and they cost a lot less. So this one is made with plywood, not cardboard. Piece of cake. 


Now Roy came back in on Thursday to paint and redo the the electric. 
While I am needed on another job that I was asked to help out. Mike has to ripe ot a ceiling in a bedroom. So I told him no problem.  I will share that tomorrow morning. 
But to get as far as we did on Wednesday was a beautiful thing. 
It was all about what HE did. Praise Him. 

No comments:

Post a Comment

Hello again, going to talk about the old shed in back.

When I started this project, I really was just thinking of running 12 wires to the back and hooking it up and let it alone. But as I have a ...