Tuesday, June 11, 2013

We have wires to the New Bath House.










It was a lot of pulling but yes the wire is in the ground. At first we had to pull the first run by hand. Fabian feed us the wire an Kevin and I pulled. Then after that we looked at it and said let us use the Jeep, Ford Explore. So we did that. Then the last run was another pull by hand. So we pulled the wire we needed and then Fabian feed us and the guys pulled their little hearts out. You can see even Jingles wanted to be part of the fun. At the end the wire you see is left over. Not sure if Fabian had the wrong length or the store gave e more than I ordered. The total length was 385 feet. Plus 10  feet to pull inside the back laundry room. Oh well we have some extra wire. You can see by the last pictures, that is Fabian and Steven, that  was our crew.

No comments:

Post a Comment

Okay still moving forward, this is June 10th Universal Volcano Bay.

As I am getting older this is more my style. Relaxing and enjoyable. We went down this Lasy River two different times. I think each time was...