There was two times I was up on the roof. First time painting around the trim, Orange. Then the next time was putting up gutters.We work well together, it was team work. You know trying to hold the gutter up while putting in the screws? The gutters are for their rain barrel, plus the well. This way they will have enough water to do what ever is needed. You know, showers, washing clothes. Pretty much anything to do with water. The reason Edison wanted this for a while now. They have had to buy a tank of water or more for their well. Why spend the money if you don't have to. So this really is very much a great idea. It only took us a day to do it all. About the painting I got that done too. Around the house and even put one coat on the garage. It really does make a big difference. I had to get that done before the gutters went up.
Subscribe to:
Post Comments (Atom)
It really neat to watch our new school being built right here on the same property that the old school is standing.
This was the first part of putting up the walls (Oct. 29th) at our NEW WESTWOOD HIGH SCHOOL. Our Principal, Mr. Alfonso tells us that all of...
-
As I was driving down Kings Highway. This is at Angle Road. This is the road that Westwood High School is on the east side. Now I can unders...
-
Just before the hurricane was coming this way, she called a hurricane shutter company and asked for shutters. I am not sure who it was, but ...
-
Well for the last 5 weeks we have been watching these videos. I think there are 16 in all? They are called the Truth Project , Un...