Sunday, February 18, 2018

It is going well.






It really is coming together. There is plenty of insulation in this room now. Use 30 R plus some small areas use 13 R. So over all this place is set up correctly. 



This lift really was a blessing. It was hard with just Mike and I to work this up. I think Mike told me maybe 3 time, if we only had another guy to help us. I kinda of got mad at him. I told him why keep saying that? There is only you and me. Deal with it. But at the end it looks great. We put in drywall screws in every 8" to 9" apart. 



The final piece was a piece of cake. It was a little bit narrower, piece. 
As working along side with Mike it sometimes a little tense a couple of times. But in the end it all worked out. I know using the 12 foot lengths. It would have less taping and mud needed. But it was harder to handle.  I was telling him they have 8 foot by 4 foot????? The room was 137" long. Mike cut the boards to 136" so it was tight fit.  




As we finished up the mud work. It looked great and just knowing how good a job we did, I could be very proud to say this job was done correctly. 
I look on and say thank you Lord for letting me be part of this job. 



No comments:

Post a Comment

I had a opportunity to help out my cousin.

It has been a while since I have trimmed and cleaned out her gutters too.  Oh, the reason I am here now is because Jeanne and her sisters pl...